863 B
863 B
ADDED Requirements
Requirement: Sessions retain dual transport wiring
Session lifecycle components SHALL initialize session-scoped networking services with both the primary reliable transport and the optional sync transport supplied by the integration layer.
Scenario: Client single-session initialization with dual transports
- WHEN the client integration path creates a single session and a sync transport is configured
- THEN the session-scoped services SHALL retain both transport references for subsequent message routing
Scenario: Server multi-session initialization with fallback transport
- WHEN the server integration path creates session-scoped services without a dedicated sync transport
- THEN each session SHALL continue to initialize successfully and SHALL use the primary reliable transport as the fallback lane